Summary:
Ref T9252. Currently, Harbormaster and Drydock work like this in some cases:
# Queue a lease for activation.
# Then, a little later, save the lease PHID somewhere.
# When the target/resource is destroyed, destroy the lease.
However, something can happen between (1) and (2). In Drydock this window is very short and the "something" would have to be a lighting strike or something similar, but in Harbormaster we wait until the resource activates to do (2) so the window can be many minutes long. In particular, a user can use "Abort Build" during those many minutes.
If they do, the target is destroyed but it doesn't yet have a record of the artifact, so the artifact isn't cleaned up.
Make these things work like this instead:
# Create a new lease and pre-generate a PHID for it.
# Save that PHID as something that needs to be cleaned up.
# Queue the lease for activation.
# When the target/resource is destroyed, destroy the lease if it exists.
This makes sure there's no step in the process where we might lose track of a lease/resource.
Also, clean up and standardize some other stuff I hit.
Test Plan:
- Stopped daemons.
- Restarted a build in Harbormaster.
- Stepped through the build one stage at a time using `bin/worker execute ...`.
- After the lease was queued, but before it activated, aborted the build.
- Processed the Harbormaster side of things only.
- Saw the lease get destroyed properly.
Reviewers: chad, hach-que
Reviewed By: hach-que
Maniphest Tasks: T9252
Differential Revision: https://secure.phabricator.com/D14234
Summary: Ref T9252. This is still crude in a few ways but basically works, at least for commits.
Test Plan:
- Made a build plan with just this build step.
- Ran `bin/harbormaster build --plan 10 ...` on a commit.
- It actually built a working copy, leased it, took no action, and released the lease. MAGIC~~~
Reviewers: chad
Reviewed By: chad
Maniphest Tasks: T9252
Differential Revision: https://secure.phabricator.com/D14160