Summary: See discussion in T2014. Aligns this element more closely with @chad's `frame_v3.psd` mock, and implements the icon/label element. Removes "details".
Test Plan: {F27062} {F27063} {F27064} {F27065}
Reviewers: btrahan, chad
Reviewed By: btrahan
CC: aran
Maniphest Tasks: T2014
Differential Revision: https://secure.phabricator.com/D4179
Summary: `addDetail()` takes HTML because we have links there fairly often. :/ This design is iffy.
Test Plan: Reloaded `/calendar/status/`, verified no XSS.
Reviewers: btrahan, vrana
Reviewed By: vrana
CC: aran
Maniphest Tasks: T139
Differential Revision: https://secure.phabricator.com/D4074
Summary: make it so a given user can click to edit status from calendar view. also fix bug so when editing status existing "type" is selected
Test Plan: edited status from calendar view and observed "sporadic" status sticky
Reviewers: epriestley, chad
Reviewed By: chad
CC: aran, Korvin
Maniphest Tasks: T2060, T2061
Differential Revision: https://secure.phabricator.com/D3957
Summary:
This commit doesn't change license of any file. It just makes the license implicit (inherited from LICENSE file in the root directory).
We are removing the headers for these reasons:
- It wastes space in editors, less code is visible in editor upon opening a file.
- It brings noise to diff of the first change of any file every year.
- It confuses Git file copy detection when creating small files.
- We don't have an explicit license header in other files (JS, CSS, images, documentation).
- Using license header in every file is not obligatory: http://www.apache.org/dev/apply-license.html#new.
This change is approved by Alma Chao (Lead Open Source and IP Counsel at Facebook).
Test Plan: Verified that the license survived only in LICENSE file and that it didn't modify externals.
Reviewers: epriestley, davidrecordon
Reviewed By: epriestley
CC: aran, Korvin
Maniphest Tasks: T2035
Differential Revision: https://secure.phabricator.com/D3886
Summary: you can now add, edit, and delete status events. also added a "description" to status events and surface it in the big calendar view on mouse hover. some refactoring changes as well to make validation logic centralized within the storage class.
Test Plan: added, edited, deleted. yay.
Reviewers: epriestley, vrana
Reviewed By: epriestley
CC: aran, Korvin
Maniphest Tasks: T407
Differential Revision: https://secure.phabricator.com/D3810
Summary:
I've replaced all `id(new PhabricatorObjectHandleData(...))->loadHandles()` by `$this->loadViewerHandles(...)`.
Lint caught one usage in a static method.
Test Plan: Displayed revision with sporadic author.
Reviewers: epriestley
Reviewed By: epriestley
CC: aran, Korvin
Differential Revision: https://secure.phabricator.com/D3432
Summary:
- Add getHelpURI() to PhabricatorApplication for application user guides.
- Add a new "help" icon menu item and skeletal Diviner application.
- Move help tabs to Applications where they exist, document the other ones that don't exist yet.
- Grep for all tab-related stuff and delete it.
Test Plan: Clicked "help" for some apps. Clicked around randomly in a bunch of other apps.
Reviewers: btrahan, vrana
Reviewed By: btrahan
CC: aran
Differential Revision: https://secure.phabricator.com/D3267
Summary:
- `kill_init.php` said "Moving 1000 files" - I hope that this is not some limit in `FileFinder`.
- [src/infrastructure/celerity] `git mv utils.php map.php; git mv api/utils.php api.php`
- Comment `phutil_libraries` in `.arcconfig` and run `arc liberate`.
NOTE: `arc diff` timed out so I'm pushing it without review.
Test Plan:
/D1234
Browsed around, especially in `applications/repository/worker/commitchangeparser` and `applications/` in general.
Auditors: epriestley
Maniphest Tasks: T1103
Summary:
The current state is very confusing:
{F11734, size=full}
Test Plan: Display calendar for user with two different events in the same week.
Reviewers: epriestley, btrahan
Reviewed By: epriestley
CC: aran, Koolvin
Differential Revision: https://secure.phabricator.com/D2522
Summary:
This is a rough cut, but gets some of the basics at least. Here's what it looks like:
{F11690}
Some things that would be nice for future diffs:
- Different colors for different event types (tasks? MEETINGS?!)
- When events span across multiple days, keep them in the same row.
- Switch which month you're looking at.
- Show specific users instead of all.
- etc etc etc
Test Plan: See screenshot.
Reviewers: btrahan, vrana
Reviewed By: btrahan
CC: aran
Differential Revision: https://secure.phabricator.com/D2514
Summary:
We will need it for two purposes:
- Status tool.
- Nagging tool - @aran suggested using "3 business days" and I don't want it to fall on New Year's Eve or such.
I don't plan working on any interface for editing this as this kind of data should be always imported.
Test Plan:
`bin/storage upgrade`
`scripts/calendar/import_us_holidays.php`
/calendar/
Reviewers: epriestley
Reviewed By: epriestley
CC: aran, Koolvin
Differential Revision: https://secure.phabricator.com/D2375
Summary:
These are all unambiguously unextensible. Issues I hit:
- Maniphest Change/Diff controllers, just consolidated them.
- Some search controllers incorrectly extend from "Search" but should extend from "SearchBase". This has no runtime effects.
- D1836 introduced a closure, which we don't handle correctly (somewhat on purpose; we target PHP 5.2). See T962.
Test Plan: Ran "testEverythingImplemented" unit test to identify classes extending from `final` classes. Resolved issues.
Reviewers: btrahan
Reviewed By: btrahan
CC: aran, epriestley
Maniphest Tasks: T795
Differential Revision: https://secure.phabricator.com/D1843
Summary:
This is a very small step toward building a Status and possibly an Oncall tool.
Build a calendar view which renders months.
Much of my hesitance to bang these tools out is that dealing with
dates/calendaring is basically horrible, so I'm trying to ease into it.
This calendar is locale-aware and all that jazz.
Test Plan:
- See:
https://secure.phabricator.com/file/view/PHID-FILE-c07a9c663a7d040d2529/
- Verified that months have the right number of days, today is the right day
of the week, months begin on the day after previous months end on, etc.
Reviewed By: aran
Reviewers: jungejason, tuomaspelkonen, aran
Commenters: cwbeck, jungejason
CC: blair, aran, epriestley, cwbeck, jungejason
Differential Revision: 791