epriestley
996930da2a Improve several exception behaviors for Harbormaster workers
Summary:
Ref T2015. Several fixes:

  - `checkForCancellation()` no longer exists, and isn't relevant for resumable stops. Throw it away for now.
  - Fix an issue where a build could pass even if the final step failed.
  - `phlog()` exceptions so they show up in `bin/harbormaster` and the daemon logs.
  - Write an exception log if a step fails.
  - Add a "throw an exception" step to debug this stuff more easily.

Test Plan:
  - Grepped for `checkForCancellation()`.
  - Ran a failing build where the final step caused the failure.
  - Observed `phlog()` in `bin/harbormaster` output.
  - Observed log in web UI:

{F101168}

Reviewers: btrahan, hach-que

Reviewed By: btrahan

CC: aran

Maniphest Tasks: T2015

Differential Revision: https://secure.phabricator.com/D7935
2014-01-13 12:21:49 -08:00
epriestley
1786093c6e Replace "Cancel Build" with "Stop", "Resume" and "Restart"
Summary:
Ref T1049. Currently you can cancel a build, but now that we're tracking a lot more state we can stop, resume, and restart builds.

When the user issues a command against a build, I'm writing it into an auxiliary queue (`HarbormasterBuildCommand`) and then reading them out in the worker. This is mostly to avoid race messes where we try to `save()` the object in multiple places: basically, the BuildEngine is the //only// thing that writes to Build objects, and it holds a lock while it does it.

Test Plan:
  - Created a plan which runs "sleep 2" a bunch of times in a row.
  - Stopped, resumed, and restarted it.

Reviewers: btrahan

Reviewed By: btrahan

CC: aran, chad

Maniphest Tasks: T1049

Differential Revision: https://secure.phabricator.com/D7892
2014-01-06 12:32:20 -08:00
epriestley
ac19c55822 Formalize "manual" buildables in Harbormaster
Summary:
Ref T1049. Generally, it's useful to separate test/trial/manual runs from production/automatic runs.

For example, you don't want to email a bunch of people that the build is broken just because you messed something up when writing a new build plan. You'd rather try it first, then promote it into production once you have some good runs.

Similarly, test runs generally should not affect the outside world, etc. Finally, some build steps (like "wait for other buildables") may want to behave differently when run in production/automation than when run in a testing environment (where they should probably continue immediately).

So, formalize the distinction between automatic buildables (those created passively by the system in response to events) and manual buildables (those created explicitly by users). Add filtering, and stop the automated parts of the system from interacting with the manual parts (for example, we won't show manual results on revisions).

This also moves the "Apply Build Plan" to a third, new home: instead of the sidebar or Buildables, it's now on plans. I think this generally makes more sense given how things have developed. Broadly, this improves isolation of test environments.

Test Plan: Created some builds, browsed around, used filters, etc.

Reviewers: btrahan

Reviewed By: btrahan

CC: aran

Maniphest Tasks: T1049

Differential Revision: https://secure.phabricator.com/D7824
2013-12-26 10:40:43 -08:00
epriestley
9c938701c3 Modernize Diffusion commitparentsquery
Summary: Ref T4195. Ref T2783. We have an old-school implementation of this; move it into a LowLevel query and make callers all run through Conduit. I need the LowLevel query for hooks, to implement an "is merge commit" Herald rule.

Test Plan:
  - Ran query via Conduit for SVN, Mercurial, Git.
  - Parsed a commit which closed a revision, attach/closed worked correctly.
  - Browsed Diffusion.

Reviewers: btrahan

Reviewed By: btrahan

CC: aran

Maniphest Tasks: T4195, T2783

Differential Revision: https://secure.phabricator.com/D7808
2013-12-20 12:39:21 -08:00
James Rhodes
270c8d27ab Implement "Wait for Previous Builds" build step
Summary: This adds a build step which will block a build from continuing if there are previous builds of the build plan still running.

Test Plan: Configured a build plan with a wait of 60 seconds and a "wait for previous builds", then started a build.  While that was still building, reconfigured the plan to have a wait time of 3 seconds, started it, and saw it move into the "Waiting" status.  When the 60 second build finished, both builds passed.

Reviewers: epriestley, #blessed_reviewers

Reviewed By: epriestley

CC: Korvin, epriestley, aran

Maniphest Tasks: T1049

Differential Revision: https://secure.phabricator.com/D7745
2013-12-10 11:02:34 +11:00