1
0
Fork 0
mirror of https://we.phorge.it/source/phorge.git synced 2024-09-22 18:28:47 +02:00
Commit graph

67 commits

Author SHA1 Message Date
Cristian Adamo
8cca3079fc Add subprojects to a main project.
Summary:
Quite basic subproject attachment.

Test Plan:
Go to some proj
ect and add another as a subproject.
Play around the ui.

Reviewers:	epr
iestley
CC:
2011-07-19 15:50:15 -03:00
epriestley
a49138defd Generalize the markup engine factory
Summary:
This thing services every app but it lives inside Differential right now. Pull
it out, and separate the factory interfaces per-application.

This will let us accommodate changes we need to make for Phriction to support
wiki linking.

Test Plan: Tested remarkup in differential, diffusion, maniphest, people,
slowvote.
Reviewed By: hsb
Reviewers: hsb, codeblock, jungejason, tuomaspelkonen, aran
CC: aran, hsb
Differential Revision: 646
2011-07-11 16:36:30 -07:00
Evan Priestley
61f2ba5c47 Merge pull request #32 from CodeBlock/420235f9c4e1a25d6afb1e6eed2896307be8d09e
D612
2011-07-08 12:27:53 -07:00
Ricky Elrod
420235f9c4 Drag-drop file upload.
Summary:
- have files be uploaded by drag+drop instead of browse.
- Files are named by their uploaded filename, the user isn't given a chance to enter a file name. Is this bad?
- Store author PHID now with files
- Allow an ?author=<username> to limit the /files/ list by author.
- If one file is uploaded, the user is taken to its info page.
- If several are uploaded, they are taken to a list of their files.

Test Plan:
- Quickly tested everything and it still worked, I'd recommend some people try this out before it gets committed though. It's a rather huge revision.

Reviewers:
epriestley, Ttech

CC:

Differential Revision: 612
2011-07-08 15:20:57 -04:00
epriestley
a3e676b9d4 Remedy a fatal-flavored oversight. 2011-07-07 16:06:27 -07:00
epriestley
30dbdf322d Show open tasks on project pages
Summary: This is pretty basic but gets us most of the way there I think. Could
use some style tweaks at some point.
Test Plan: Looked at a project page with open tasks, and one without open tasks.
Reviewed By: tuomaspelkonen
Reviewers: cadamo, aran, jungejason, tuomaspelkonen
CC: aran, tuomaspelkonen, epriestley
Differential Revision: 609
2011-07-07 15:54:45 -07:00
epriestley
cef7664d47 Move Project list to use ManiphestTaskQuery
Summary: We decided to move away from driving everything through the search
engine since it doesn't scale terribly well, so use ManiphestTaskQuery instead.
Also link the open count and tweak some display stuff.
Test Plan: Looked at project list, clicked open tasks link
Reviewed By: tuomaspelkonen
Reviewers: cadamo, aran, jungejason, tuomaspelkonen
CC: aran, tuomaspelkonen
Differential Revision: 608
2011-07-07 15:27:19 -07:00
epriestley
f61a02e342 Use phutil_utf8_shorten() in PhabricatorProjectListController
Summary: This is a little cleaner and more general than textWrap(). See also
D559.
Test Plan: Loaded project list page, edited a project description to have >100
characters of text, reloaded list page, it was correctly shortened.
Reviewed By: tuomaspelkonen
Reviewers: cadamo, jungejason, aran, tuomaspelkonen
CC: aran, tuomaspelkonen
Differential Revision: 584
2011-07-05 09:55:43 -07:00
epriestley
e0e6ec9117 Allow affiliations to carry project ownership information; transform profile
images correctly

Summary:
This is sort of doing two things at once:

  - Add an "isOwner" flag to Project Affiliation to lay the groundwork for T237.
  - Rename the "QuickCreate" workflow to "Create" and funnel all creation
through it.
  - Reorganize the image transformation stuff and use it to correctly
crop/resize uploaded images.

Test Plan:
Created and edited projects and affailiations. Uploaded project, user, and
profile photos. Verified existing thumbnailing in Maniphest still works
properly.

Reviewed By: cadamo
Reviewers: cadamo, aran, jungejason, tuomaspelkonen
CC: aran, epriestley, cadamo
Differential Revision: 529
2011-06-28 06:40:41 -07:00
epriestley
b093113d02 Fix fatal on project editing
Summary:
I didn't grep carefully enough when renaming this to 'loadProject' in D485. See
task. I am terrible at the programmings.

Test Plan:
Hit the "Edit project" view, grepped more thoroughly. :P

Reviewed By: tomo
Reviewers: tomo, toulouse, cadamo
CC: aran, tomo
Differential Revision: 503
2011-06-23 11:08:04 -07:00
epriestley
431c57688e Improve performance of project list view
Summary:
D477 added functionality to the project list view but had a couple of
performance issues that I missed in review, because it took the query count for
the page from around 3 to as many as 300, including up to 100 heavyweight search
index queries.

This fixes the two simple N+1 query problems. This general pattern of data
access often occurs:

  COUNTEREXAMPLE
  $cats = load_cats();
  foreach ($cats as $cat) {
    $cats_hats = load_hats_for_cat($cat);
    // ...
  }

But this issues "N+1" queries, i.e. if you load 100 cats you issue 101 queries.
It is faster to group the queries instead:

  $cats = load_cats();
  $hats = load_all_hats_for_these_cats($cats);
  foreach ($cats as $cat) {
    $cats_hats = $hats[$cat->getID()];
  }

MySQL can execute one query which returns all the results much faster than 100
queries which return one result, especially if the database is not local (i.e.,
over the network).

However, this doesn't save a ton of time. The bigger issue is that I didn't have
the right keys on the relationship tables in the search engine. This adds them,
and reduces the search engine lookup cost from 25-80ms (for
secure.phabricator.com) down to 1-3ms.

I still probably want to get this out of the loop at some point but it's okay
for now and the page loads in a few ms rather than taking more than a second.

Test Plan:
Used "services" tab, "xhprof" and "EXPLAIN" to analyze page performance. I
measured these changes:

  - Query count: 1 + (3 * N projects) -> 3 + (N projects) (e.g., 301 -> 103)
  - Total time spent querying, ignoring search indexes: 40ms (local.aprhont.com)
-> 20ms (local.aphront.com)
  - Cost for search index query: 25-80ms (secure.phabricator.com) -> 1-3ms

Reviewed By: cadamo
Reviewers: cadamo, aran, jungejason, tuomaspelkonen
CC: aran, cadamo, epriestley
Differential Revision: 485
2011-06-21 14:43:15 -07:00
Cristian Adamo
7851b6573f Project list and profile view modifications
Summary: Added some change on the project's list view, to show information about
active tasks, population, etc. Also modified the "profile view", and added a class "PhabricatorProfileView" to render the profile, both on projects and users.

Test Plan: play around the project directory :)

Reviewers: epriestley ericfrenkiel

CC:

Differential Revision: 477
2011-06-20 16:13:44 -03:00
epriestley
eab768f705 Allow projects to be quickly added from the Maniphest task creation interface
Summary:
Provide a quick workflow for adding a new project. This ended up being sort of
complicated because we don't currently put forms in dialogs. I separated the
actual <form /> tag out of the display/layout of AphrontFormView to enable this
(the dialog is itself a form).

Limitations: if you create a new project and then remove it, it won't appear in
the tokenizer until you reload the page. We need to add the ability for the
datasource to drop its cache to enable this, which is super complicated.

Test Plan:
Used "Create new project" to add a new project when creating a task.

Reviewed By: aran
Reviewers: jungejason, tuomaspelkonen, aran
CC: anjali, aran, epriestley
Differential Revision: 422
2011-06-13 10:17:08 -07:00
Hafsteinn Baldvinsson
4a8ffe4b67 Fixes for the project page
Summary:
Wrong header, should say Project instead of People and two buttons had "Project
Project"

Test Plan:
UI fixes, no real test plan needed

Reviewers: tuomaspelkonen, aran
Commenters: tuomaspelkonen, aran
CC: aran, tuomaspelkonen, hsb, epriestley
Revert Plan:
No plan needed, just revert this UI fix revision

Differential Revision: 338
2011-06-11 02:54:40 +00:00
epriestley
361ec78b03 Add missing includes from XHPAST parse bug. 2011-04-06 23:14:58 -07:00
epriestley
7fb9a48690 Task -> Project assocation, file uploads
Summary:

Test Plan:

Reviewers:

CC:
2011-02-20 20:08:53 -08:00
epriestley
fdd510ba17 Rough cut of projects.
Summary:

Test Plan:

Reviewers:

CC:
2011-02-20 18:41:23 -08:00