Change recommended for standardization purposes (currently soundhax and ntrboot use 12.0.1 and don't prompt people to update which is inconsistent)
At the moment, 13.x is unable to boot on at least 10.6 and below. So, to ensure that guide pages are (at least mostly) consistent, using 12.0.1 on all* pages and then prompting user to update luma in finalizing setup. This involves reorganizing finalizing setup a bit so that the cfw check and system update come before we modify the sd card.
Note: Change currently not copied to kartdlphax as this would involve reverting to an older commit and would cause complications with 3gx 12.0.1.
- Convert FAQ and Troubleshooting pages to clickable dropdowns to improve readability.
- Add separate table of contents to Troubleshooting (for mobile users)
- Remove a couple of irrelevant troubleshooting
- Update pages that link to troubleshooting to use new headers
* faq+troubleshooting: dropdowns
- Convert FAQ and Troubleshooting pages to clickable dropdowns to improve readability.
- Add separate table of contents to Troubleshooting (for mobile users)
- Remove a couple of irrelevant troubleshooting
- Update pages that link to troubleshooting to use new headers
* a9lh-to-b9s: fix typo
* Link directly to the boot9strap zip
* soundhax b9s
* ntrboot b9s
* atob
* Update homebrew-launcher-(soundhax).txt
* Update flashing-ntrboot-(nds).txt
* Update flashing-ntrboot-(3ds-single-system).txt
* Update flashing-ntrboot-(3ds-multi-system).txt
* direct link for hardmod+troubleshooting
Co-authored-by: Lily <lily@uwuu.ca>
These QOL changes:
- Add information about DNS issues to safecerthax and SSLoth-Browser.
- Change instaces of "ntr boot9strap" and "standard boot9strap" to their actual filenames, to lessen confusion.
- Instructs users to click the QR code button in the camera before scanning it.
* transition b9s update to use finalizing setup
this helps to get folks on 7.1 to current apps to include gm9, and to create an essentials backup if needed.
it also centralizes the recommended apps to a single page rather than splitting them across multiple
* use finalizing setup for a9lh-to-b9s
centralize app recommendation and backup steps to finalizing setup